COMPLETED PROJECTS
The SEG company began to carry out work on the installation of foreign equipment on the territory of the confectionery factory "F. Skrupskaya "in the town of Pikalevo.
Scand Engineering Group (SEG) carries out installation work on the equipment for packing and packaging Ricciarelli products (Italy).
Petrogradskaya nab., 2-4 lit. A, St. Petersburg, 197046
SEG carries out a set of works on the installation of a lightning protection and roof heating system.
Levashovskoe sh., 20, building 1, Sestroretsk, St. Petersburg, 197701
SEG carries out a complex of works on the installation of electrical and low-current systems to expand the existing stamping shop
Builders Blvd, 2, Krasnogorsk, Moscow region, 143407
Reconstruction of switchgear type
NXPLUS C
Romania, Bucharest, Rudeni Stud
Dismantling supervision, installation supervision and commissioning of the Fava production line (Italy), and equipment for packing and packaging Ricciarelli (Italy).
Scand Engineering Group (SEG) has completed a project to remove 10 kV electrical cable networks from a building site. The work was hampered by a short time period (36 hours), which ...
Development and maintenance of an outage (project of work) throughout the life of the project, taking into account Shutdowns. Development of the detailed design of the reconstruction ...
Mounted automation control technological equipment. The installation of cable trays with the laying of cable lines was carried out. Mounted and unplugged shields automation. Connected equipment and produced ...
Development and maintenance of PPR (project work) for the duration of the project. Development of the working draft. Supply of equipment for the implementation of ...